1 Jan 2011:
Happy New Year! ROOL continues to ship updates of the Release 20 C Tools
17 Jan 2011:
Tonnes of behind-the-scenes administration going on. Dealing with things that have been stalled because of a work trip to India and sorting through various other things.
1 Feb 2011:
Made lots of small changes to the ROOL website. This process is on-going and some more interesting stuff will probably appear in the new future…
14 Feb 2011:
Did a bit of restructuring and tidying up of the “Software” (was “Downloads”) sections of the ROOL site. I hope that these changes make it a bit easier to find stuff – certainly, the division between pre-built stuff and source code should be much clearer.