Showing changes from revision #2 to #3:
Added | Removed | Changed
1 Jan 2011:
Happy New Year! ROOL continues to ship updates of the Release 20 C Tools
17 Jan 2011:
Tonnes of behind-the-scenes administration going on. Dealing with things that have been stalled because of a work trip to India and sorting through various other things.
1 Feb 2011:
Made lots of small changes to the ROOL website. This process is on-going and some more interesting stuff will probably appear in the new future…
14 Feb 2011:
Did a bit of restructuring and tidying up of the “Software” (was “Downloads”) sections of the ROOL site. I hope that these changes make it a bit easier to find stuff – certainly, the division between pre-built stuff and source code should be much clearer.
14 Mar 2011:
Rolled-out the new look web site. This doesn’t look a lot different to the previous version but there is an horrific amount of stuff changed under the hood. Hopefully, it will be faster, better and more stable. Oh, and the Bounties stuff is now visible to the public (albeit not particularly underway yet).
17 Mar 2011:
Significant overhaul of the way builds are performed on RISC OS to greatly simplify a number of key areas. There will be a wiki page about this soon.